Want to create an interactive transcript for this episode?
Podcast: Mining Stock Daily
Episode: Insights into the Tonopah Gold Project PEA from Viva Gold
Description: Viva Gold published an updated Preliminary Economic Assessment for the Tonopah Gold Project in Nevada last month. CEO Jim Hesketh joins the podcast to provide his editorial comments on the report and breakdown the difference between this report and reports of the project's past. The updated MRE reportsĀ measured and indicated (āMā)Ā Mineral ResourceĀ containing 504,000 ounces gold (āAuā)Ā atĀ 0.59 grams per tonne (āg/tāĀ Au, 1.8 million ounces silver (āAgā)Ā 2.05 g/t Ag, and an inferredĀ Mineral ResourceĀ of 83,000 ounces AuĀ atĀ 0.37 g/t Au, 402,000 ounces Ag, atĀ 1.81 g/t Ag, all constrained within a pit shell above a 0.15 g/t Au cut-off