Want to create an interactive transcript for this episode?
Podcast: Mining Stock Education
Episode: Tier One Silver Confirms Silver Discovery & Plans Phase 2 Drill Program with SVP Expl Christian Rios
Description: In this interview, CEO Peter Dembicki, Co-Chair Ivan Bebek and SVP Exploration Christian Rios discuss the results from the last five drill holes of the first phase of drilling at the Curibaya project in southern Peru. Hole 16 intercepted 1.5 metres (m) of 1,213.7 g/t silver equivalent (AgEq) in a larger interval of 7 m of 299.1 g/t AgEq on the Sambalay structural corridor. This drill hole targeted higher elevations of the intermediate sulphidation system than the majority of the holes drilled to date and is located on a two kilometre (km) corridor that extends toward the Cambaya target area, where the Company...