Want to create an interactive transcript for this episode?
Podcast: AvTalk - Aviation Podcast
Episode: A non-standard manufacturing process
Description: On this episode of AvTalk, Boeing stops deliveries of most 737 MAX due to a βnon-standard manufacturing processβ on the fuselage-vertical fin joint. Sudanese airspace is closed after renewed fighting. And some former Polar Air Cargo executives and suppliers could be facing lengthy prison sentences. Sudan airspace closed, aircraft destroyed Multiple civilian aircraft were destroyed [β¦]
The post AvTalk Episode 212: A non-standard manufacturing process appeared first on Flightradar24 Blog.